thread_prefix.19 I cannot change order of some blockers

No Game ID
Game ID
dragobarbut097
Screenshot or Video
  1. 1 or more
file:///C:/Users/milos/OneDrive/Immagini/Catture%20di%20schermata/Screenshot%202024-06-16%20190353.png

Hi! As depicted in the image, i declared an attack with some creatures. My opponent double blocked my wumpus aberration and my Voidpouncer. I tried to change the order of blockers and drag writhing chrysalis to the left but the game does not permitted me to do so. I thought first that it was mine mistake cause maybe i already passed to the next phase but as i checked it wasnt the case. In fact when i tried to change the order of blockers for the voidpuncer block it worked. I tried multiple times to do so also for the blockers of wumpus aberration but it wasnt possible. The result was a trade that i didnt want to take
 
So basically i tried to put chrysalis multiple time on the left but everytime i tried it was impossible. When i tried to switch coatl and hydra trainer in the other block everything was fine
 

Neo001992

Well-known member
So basically i tried to put chrysalis multiple time on the left but everytime i tried it was impossible. When i tried to switch coatl and hydra trainer in the other block everything was fine
Thank you uploading the screenshot again, it was very useful to see what was wrong here. In your screenshot the client was wanting you to order blockers for the Voidpouncer since it was highlighted in green. After you reordered blockers for that creature and clicked "Ok" the client should have moved over to Wumpus Aberration for you to reorder those blockers.

Here are screenshots from a test game of different attackers going through the process of reordering blockers, and the client does handle this one creature at a time.


Event#269665828 Game#881863538
 
Top